Key project differences

 Felton demonstration projectambreCTL
Description 455 tonnes per day dimethyl ether (DME) pilot plant to demonstrate new technology
coal gasification plant (above ground) and demonstration-scale reactor
18,000 barrels of unleaded petrol per day
940 ML/yr commercial-scale coal gasification facility, proven technology
Scale and scope mine developed in two stages, eventually expanding to 3.8 Mtpa full scale commercial capacity
Feed coal (source) 0.8 Mtpa from adjoining Ambre Energy open-cut coal mine 8.0 Mtpa coal and interburden material extracted, crushed and washed each year to supply 4.0 Mtpa of feed coal
Technology gasify coal and convert resulting syngas to DME, a cleaner diesel replacement gasify coal and convert resulting syngas to methanol
convert methanol to zero-sulphur unleaded petrol and LPG, using ExxonMobil MTG technology
Estimated capital expenditure around $485 million more than $3.5 billion, mostly invested in the first three to four years
Direct employment 600 jobs during construction
125 ongoing jobs
1,880 jobs during peak construction averaging 1,170 over two year period
530 ongoing jobs in the Darling Downs, 1,600 jobs ongoing Australia-wide